2020
DOI: 10.1155/2020/8565921
|View full text |Cite
|
Sign up to set email alerts
|

Bi-Objective Re-Entrant Hybrid Flow Shop Scheduling considering Energy Consumption Cost under Time-of-Use Electricity Tariffs

Abstract: Re-entrant hybrid flow shop scheduling problem (RHFSP) is widely used in industries. However, little attention is paid to energy consumption cost with the raise of green manufacturing concept. is paper proposes an improved multiobjective ant lion optimization (IMOALO) algorithm to solve the RHFSP with the objectives of minimizing the makespan and energy consumption cost under Time-of-Use (TOU) electricity tariffs. A right-shift operation is then used to adjust the starting time of operations by avoiding the pe… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
16
0

Year Published

2020
2020
2025
2025

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 33 publications
(16 citation statements)
references
References 39 publications
0
16
0
Order By: Relevance
“…In this paper, the uniform speed of the vehicles is considered, where τ � 0, but the influence of the gradient of the vehicle is not considered. en, the per unit time of the vehicle t is shown in equation (6). erefore, the energy consumption of the transportation stage can be given as shown in equation (7), where the unit of speed is m/s:…”
Section: Energy Consumption Of Transportation Stage (Ec St2 )mentioning
confidence: 99%
See 1 more Smart Citation
“…In this paper, the uniform speed of the vehicles is considered, where τ � 0, but the influence of the gradient of the vehicle is not considered. en, the per unit time of the vehicle t is shown in equation (6). erefore, the energy consumption of the transportation stage can be given as shown in equation (7), where the unit of speed is m/s:…”
Section: Energy Consumption Of Transportation Stage (Ec St2 )mentioning
confidence: 99%
“…e production process plays an important role in the manufacturing industry. In recent years, in order to reduce energy consumption in the production process, many studies have been conducted on improving the energy efficiency [2][3][4][5][6]. However, among the methods, production scheduling is the most effective and prioritized way to improve the energy efficiency of the manufacturing industry [7].…”
Section: Introductionmentioning
confidence: 99%
“…Geng and al. (2020) [11] developed a two-objective optimization model for a hybrid flow-shop type scheduling problem considering the energy consumption costs based on the time of use (TOU) of electricity. Gong and al.…”
Section: Introductionmentioning
confidence: 99%
“…[8−12] used a neural network to solve different scheduling problems. Reference [13] adopted reinforcement learning based approaches to multi-objective dynamic scheduling. Reference [14] presented an inductive learning method based real-time scheduling mechanism for reentrant hybrid flow shops.…”
Section: Introductionmentioning
confidence: 99%