2005
DOI: 10.1007/s00170-004-2378-y
|View full text |Cite
|
Sign up to set email alerts
|

Bid construction scheme for job flow time reduction in auction-based fully-distributed manufacturing systems

Abstract: This study presents a novel bid construction scheme for an auction-based fully-distributed manufacturing system. The scheme is applied to the planning and control of manufacturing activities. A set of independent machining resources in the system, each with several ongoing set-up dependent jobs, compete for an upcoming job. The manner in which a resource constructs a bid determines job allocation and resource utilization and, consequently, job flow times. Resources that employ simple heuristic methods (e.g., b… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2011
2011
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 13 publications
references
References 23 publications
0
0
0
Order By: Relevance