2016
DOI: 10.1016/j.egypro.2016.01.009
|View full text |Cite
|
Sign up to set email alerts
|

BIGCCS Innovations – Measures to Accelerate CCS Deployment

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
4

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 27 publications
0
4
0
Order By: Relevance
“…Three to four stages are typical if the CO 2 is available at 1 bara, but compression might also not be necessary if the CO 2 is already available at high pressure, as in scenarios 3 and 4. A compression stage includes a compressor, an intercooler, and a flash separator removing condensed water.After the compression train, the CO 2 stream passes into an impurity removal unit 2 where potential impurities are removed if required. It is cooled and condensed through a pre-cooler 3 and a liquefier cooled by an ammonia refrigeration loop 4 .…”
Section: Co 2 Liquefactionmentioning
confidence: 99%
See 2 more Smart Citations
“…Three to four stages are typical if the CO 2 is available at 1 bara, but compression might also not be necessary if the CO 2 is already available at high pressure, as in scenarios 3 and 4. A compression stage includes a compressor, an intercooler, and a flash separator removing condensed water.After the compression train, the CO 2 stream passes into an impurity removal unit 2 where potential impurities are removed if required. It is cooled and condensed through a pre-cooler 3 and a liquefier cooled by an ammonia refrigeration loop 4 .…”
Section: Co 2 Liquefactionmentioning
confidence: 99%
“…The cost of CO 2 conditioning and transport [20], expressed by Equation (2), is used in this study as a cost performance metric for both optimisation and comparison of the transport chains. This cost performance metric is computed considering a real discount rate of 8%, a project duration of 25 years, and an operating rate of 85%.…”
Section: Cost Performance Metricmentioning
confidence: 99%
See 1 more Smart Citation
“…In this study, we are investigating the potential value creation from application of innovations created in a major CCS research centre; The BIGCCS International CCS Research Centre [4]. BIGCCS was mainly funded by the Research Council of Norway and participating industry partners.…”
Section: Introductionmentioning
confidence: 99%