2015
DOI: 10.1016/j.autcon.2015.03.008
|View full text |Cite
|
Sign up to set email alerts
|

BIM-based integrated approach for detailed construction scheduling under resource constraints

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
68
0
10

Year Published

2016
2016
2021
2021

Publication Types

Select...
5
3
1

Relationship

0
9

Authors

Journals

citations
Cited by 164 publications
(78 citation statements)
references
References 27 publications
0
68
0
10
Order By: Relevance
“…With the development of three-dimensional (3D) modeling software and building information modeling (BIM) technology, the way building information is represented and managed has the potential to be revolutionized [52]. Although the value of BIM has been recognized by designers in the construction industry, the applications of BIM are limited to visualization, collision detection, and construction simulation [60,[73][74][75]. In terms of the detailed design of a PHP project, numerous limitations related to the information exchange in both geometric shape information and other semantically meaningful information between architects (the Industry Foundation Classes (IFC) format) and fabricators (the Standard ACIS Text (SAT) format) have impeded the BIM technology in the detailed design phase [58].…”
Section: The Maturity Of Techniques Used In the Detailed Design Phasementioning
confidence: 99%
“…With the development of three-dimensional (3D) modeling software and building information modeling (BIM) technology, the way building information is represented and managed has the potential to be revolutionized [52]. Although the value of BIM has been recognized by designers in the construction industry, the applications of BIM are limited to visualization, collision detection, and construction simulation [60,[73][74][75]. In terms of the detailed design of a PHP project, numerous limitations related to the information exchange in both geometric shape information and other semantically meaningful information between architects (the Industry Foundation Classes (IFC) format) and fabricators (the Standard ACIS Text (SAT) format) have impeded the BIM technology in the detailed design phase [58].…”
Section: The Maturity Of Techniques Used In the Detailed Design Phasementioning
confidence: 99%
“…[18,22,31]), particle swarm optimization (e.g. [20,32,33]), linear and integer programming (e.g. [21]), artificial intelligent system (e.g.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Lau et al (2014) presented an approach to discretize continuous resources. Liu et al (2015) integrated model information with a simulation framework. They integrated model information within the simulation framework.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Some researchers utilized simulation to schedule tasks in the construction industry (Lu 2003;Lu et al 2008;Liu et al 2015;and Hu and Mohamed 2013). Khadem et al (2017) utilized simulation to estimate delays and budget on a case study from an oil and gas industry.…”
Section: Literature Reviewmentioning
confidence: 99%