BIM-Based Simulator for Rebar Placement

Abstract: Reinforcing bars (rebar) comprise an integral part of a concrete structure, and play a major role in the safety and durability of the building. However, the actual placement or installation of rebar is not planned and controlled by the detailer. Recently, 4D simulations, using 3D model and scheduling software, have been used to improve the efficiency of the construction phrase. However, 4D simulators have not been introduced at the detailed level of work, such as rebar placement. Therefore, this paper suggests… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
6
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
5
3
1

Relationship

0
9

Authors

Journals

citations
Cited by 16 publications
(6 citation statements)
references
References 4 publications
0
6
0
Order By: Relevance
“…Alternatively, a rebar drawing is created by applying CWM algorithm. [3,6,55,84,[86][87][88][89]91,95,97,98,103,105,108,110,111,114,119,120] Quantity take-off Rebar CWM algorithm is connected to the QTO task and progress. [3,5,6,[85][86][87]90,91,98,103,107,108,111,113,115,116] Rebar production…”
Section: Drawing Workmentioning
confidence: 99%
See 1 more Smart Citation
“…Alternatively, a rebar drawing is created by applying CWM algorithm. [3,6,55,84,[86][87][88][89]91,95,97,98,103,105,108,110,111,114,119,120] Quantity take-off Rebar CWM algorithm is connected to the QTO task and progress. [3,5,6,[85][86][87]90,91,98,103,107,108,111,113,115,116] Rebar production…”
Section: Drawing Workmentioning
confidence: 99%
“…[ 84,85,89,97,98,102,103,105,110,112,118,120] Unlike ordinary materials, quite many variables should be considered in the case of the exact QTO work of rebars. It is a complex task that should reflect the size of stock material, concrete cover, and lap splice length, as well as variables not shown in the drawing, such as bending margin.…”
Section: Drawing Workmentioning
confidence: 99%
“…Building Information Modeling has the capability to automate a quantity takeoff, which will reduce the time and costs required to estimate a project [5]. The system using Autodesk Revit API automatically generates rebar placement plans for a building structure and labels the placement sequence of each individual bar or set of bars with ascending numbers [6]. At present, most rebar BIM models are established according to the two-dimensional map.…”
Section: Introductionmentioning
confidence: 99%
“…Various researchers in the past have tried to solve the problem of the clash detection and resolution for automated design of rebar with the aid of BIM technology, in the literature, Park [3] developed a BIMbased simulator to determine the sequence of rebar placement, and the clashes of rebar were identified by a developed application programming interface. Nevertheless, it focused on the simulation of the placement sequence and the spatial clash has to be solved manually.…”
Section: Introductionmentioning
confidence: 99%