2021
DOI: 10.1007/978-3-030-86960-1_54
|View full text |Cite
|
Sign up to set email alerts
|

BIM Interoperability and Data Exchange Support for As-Built Facility Management

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
6
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 19 publications
(6 citation statements)
references
References 13 publications
0
6
0
Order By: Relevance
“…A number of authors have acknowledged that FM requires a complex selection of interrelated data and argue that BIM authoring tools alone are insufficient for managing all the data required for FM [25,50,62].Whilst BIM conceptually requires all information to be stored in a single space, other authors such as Munir et al [46] suggest that this can involve multiple systems as long as the systems are linked. Thus, data must be transferrable across platforms, and hence, the Open BIM exchange formats (e.g., COBie) were created to this end [54]. However, as previously mentioned, the existing exchange formats are currently insufficient for BIM-FM.…”
Section: Lack Of Data Exchange Formatsmentioning
confidence: 99%
See 3 more Smart Citations
“…A number of authors have acknowledged that FM requires a complex selection of interrelated data and argue that BIM authoring tools alone are insufficient for managing all the data required for FM [25,50,62].Whilst BIM conceptually requires all information to be stored in a single space, other authors such as Munir et al [46] suggest that this can involve multiple systems as long as the systems are linked. Thus, data must be transferrable across platforms, and hence, the Open BIM exchange formats (e.g., COBie) were created to this end [54]. However, as previously mentioned, the existing exchange formats are currently insufficient for BIM-FM.…”
Section: Lack Of Data Exchange Formatsmentioning
confidence: 99%
“…The limitation of their work is that the intention was to transfer the information to an FM system at a later date, thus rendering the BIM model obsolete. Di Filippo et al [54] carried out client interviews to generate a list of information requirements, but only managed to identify a total of five requirements with unclear justification.…”
Section: Theoretical Requirements For Bim-fm 71 Theoretical Informati...mentioning
confidence: 99%
See 2 more Smart Citations
“…But extracting FM-relevant information from these documents is thought to be timeconsuming (Babalola et al, 2021;Di Filippo et al, 2021).…”
Section: Construction Operations Building Information Exchange (Cobie) -mentioning
confidence: 99%