2014
DOI: 10.1016/j.marpol.2014.03.023
|View full text |Cite
|
Sign up to set email alerts
|

Biodiversity offsets for offshore wind farm projects: The current situation in Europe

Abstract: International audienc

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

1
43
0
1

Year Published

2015
2015
2023
2023

Publication Types

Select...
7
3

Relationship

0
10

Authors

Journals

citations
Cited by 70 publications
(45 citation statements)
references
References 40 publications
1
43
0
1
Order By: Relevance
“…Moreover, as has been stated in [214] (based on the Habitats Directive), an appropriate EIA study should be made if a MRE site is part of the Natura 2000 network, while compensatory measures are necessary in order to protect the overall integrity of Natura 2000 sites, if there are negative impacts with no alternatives.…”
Section: Environmental Impact Assessment Studiesmentioning
confidence: 99%
“…Moreover, as has been stated in [214] (based on the Habitats Directive), an appropriate EIA study should be made if a MRE site is part of the Natura 2000 network, while compensatory measures are necessary in order to protect the overall integrity of Natura 2000 sites, if there are negative impacts with no alternatives.…”
Section: Environmental Impact Assessment Studiesmentioning
confidence: 99%
“…The investigation of significant resources and the extensive growth mode as well as the human activities have produced large quantities of CO2 that directly lead to low economic benefits, environmental pollution and other problems. Therefore, how to arrange energy consumption properly [2] and minimize the impact of human activities on the ecological environment [3] have drawn increasing attention of the international community.…”
Section: Introductionmentioning
confidence: 99%
“…It is possible that the possession of more information and the monopolistic supply of the area from the manager and the inelasticity in the demand for space from the developer can lead to an unfair situation for the developer to agree or not agree at all. On the other hand, when the actual value of the MPA has been underestimated the developer can assume a lower damage and characterize the effects of his project as moderate or negligible, without convincing evidence [82]. Hence participation constraints should be set, where both players should reveal their status quo or disagreement points so that unique solutions such as the NBS and KSS can be applied and fairly distribute the surplus from MRE-MPA coexistence among players.…”
Section: Discussionmentioning
confidence: 99%