Brenner Basistunnel – Vortrieb im unmittelbaren Nahbereich von Bestandsbauwerken im Baulos Tulfes–Pfons

Abstract: This report deals with tunnelling over and under existing tunnels with unreinforced concrete linings and tunnelling under an existing tunnel only supported with shotcrete. The uppermost task was to avoid damage to the existing tunnel and this could be fulfilled through carefully staged advance steps, technically correct construction by the contractor and a dense observation network. The experience tunnelling over an existing tunnel supported only with shotcrete shows that despite slight deformation, cracks and… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 3 publications
0
1
0
Order By: Relevance
“…Construction work in the area of the Innsbruck emergency stop station got underway in the spring of 2015 and is part of the main construction lot H33 Tulfes-Pfons. The access tunnel to the Ahrental transverse cavern and the cavern itself were constructed beforehand [2].…”
Section: Tunnelling Work In the H33 Tulfes-pfons Construction Lotmentioning
confidence: 99%
“…Construction work in the area of the Innsbruck emergency stop station got underway in the spring of 2015 and is part of the main construction lot H33 Tulfes-Pfons. The access tunnel to the Ahrental transverse cavern and the cavern itself were constructed beforehand [2].…”
Section: Tunnelling Work In the H33 Tulfes-pfons Construction Lotmentioning
confidence: 99%