2023
DOI: 10.1016/j.enpol.2023.113625
|View full text |Cite
|
Sign up to set email alerts
|

Build more and regret less: Oversizing H2 and CCS pipeline systems under uncertainty

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 45 publications
0
1
0
Order By: Relevance
“…From a temporal point of view, future research could also integrate our technical representation in a dynamic version, including the rates the monopoly charges over time. This representation could also inform emerging policy discussions, such as the need for optimally oversized transportation infrastructures (see, e.g., Nicolle and Massol (2023) for a preliminary discussion), the debates on the timing of future regulatory interventions, or whether regulation should be ex-ante or ex-post.…”
Section: Insights For Regulationmentioning
confidence: 99%
“…From a temporal point of view, future research could also integrate our technical representation in a dynamic version, including the rates the monopoly charges over time. This representation could also inform emerging policy discussions, such as the need for optimally oversized transportation infrastructures (see, e.g., Nicolle and Massol (2023) for a preliminary discussion), the debates on the timing of future regulatory interventions, or whether regulation should be ex-ante or ex-post.…”
Section: Insights For Regulationmentioning
confidence: 99%