2020
DOI: 10.3390/en13092376
|View full text |Cite
|
Sign up to set email alerts
|

Building a Decision-Making Support Framework for Installing Solar Panels on Vertical Glazing Façades of the Building Based on the Life Cycle Assessment and Environmental Benefit Analysis

Abstract: Glazing is considered as a preferred solution for the buildability, aesthetic, and comfort of commercial buildings since glass cover can protect occupants from external environmental conditions, ensure the light transmission, and provide view and ventilation. At the same time, in the context of climate change and global warming, the use of renewable solar energy, such as solar and wind power, are encouraged to be utilized. Specifically, solar energy has become a renewable energy source that is clean and endles… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
4
3

Relationship

1
6

Authors

Journals

citations
Cited by 10 publications
(2 citation statements)
references
References 58 publications
0
2
0
Order By: Relevance
“…The integration of BIM and BEM can provide numerous advantages throughout various stages of the construction project. During the concept design stage, a simplified thermal zone is sufficient for the rough energy model to evaluate design concepts, such as building orientation, site location, renewable energy sources, and building massing [21]. Even though assumptions must be made regarding the energy model at this stage, the energy model helps the design team to compare the performance of different design alternatives [22].…”
Section: The Integration Of Bim and Bemmentioning
confidence: 99%
“…The integration of BIM and BEM can provide numerous advantages throughout various stages of the construction project. During the concept design stage, a simplified thermal zone is sufficient for the rough energy model to evaluate design concepts, such as building orientation, site location, renewable energy sources, and building massing [21]. Even though assumptions must be made regarding the energy model at this stage, the energy model helps the design team to compare the performance of different design alternatives [22].…”
Section: The Integration Of Bim and Bemmentioning
confidence: 99%
“…Prefabricated construction is a method wherein building components are produced and assembled in an offsite factory before being transported to the construction site for erection [5]. This technology brings several advantages [6].…”
Section: Introductionmentioning
confidence: 99%