Cable-stayed Bridge over the Odra River in Wroclaw, Poland

Abstract: <p>The largest bridge along the motorway ring road of Wroclaw is a cable-stayed structure over the Odra River near Redzin water stage of fall. The river flows there in its main bed, while inland navigation uses additional water channels. An island, where the pylon of the new bridge is situated, is located between the river and the channels. The bridge is 1742 m long and consists of a 610 m long southern flyover, a 612 m long cable-stayed main bridge with separate decks suspended to one 122 m high pylon a… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
4
0

Year Published

2014
2014
2022
2022

Publication Types

Select...
3

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…6): deflection at the previous segment (Δh1), displacement due to slop at the end of the previous segment (Δh2), and displacement due to deformation of segment itself (Δh3). The computer program was used to analyze the "K dzierzyn-Ko e" bridge, which was constructed in Poland, where the cantilever consists of (15) segments whit two prestressed cables in each stage [13]. Figs.…”
Section: Deformationmentioning
confidence: 99%
See 1 more Smart Citation
“…6): deflection at the previous segment (Δh1), displacement due to slop at the end of the previous segment (Δh2), and displacement due to deformation of segment itself (Δh3). The computer program was used to analyze the "K dzierzyn-Ko e" bridge, which was constructed in Poland, where the cantilever consists of (15) segments whit two prestressed cables in each stage [13]. Figs.…”
Section: Deformationmentioning
confidence: 99%
“…( 8) and ( 9) show the dimensions and cross-section of the bridge, and Table 1 shows the timetable for construction and other details. " bridge in cm [13]. Other values required for the calculating are:…”
Section: Deformationmentioning
confidence: 99%
“…1 The largest bridge structure along the ring road is the Rę dziń ski Bridge, crossing the Odra River near Rę dzin stage of fall. 2,3 This route for the motorway through this area was selected as a Inside the pylon, a steel core as shown in Fig. 4 was placed.…”
Section: Introductionmentioning
confidence: 99%
“…An important load-carrying element of the pylon is the upper crossbeam, vertically and longitudinally posttensioned, and heavily reinforced. 2,3 The legs and arms of the pylon were cast in 34 stages. The first three phases included casting the lowest elements of the pylon, inclined outward from the bridge axis and the lower crossbeam, which was prestressed in four stages by thirty 31L15,7 cables.…”