Categorization of potential project cost overrun factors in construction industry

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0
1

Year Published

2018
2018
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 13 publications
(7 citation statements)
references
References 12 publications
0
6
0
1
Order By: Relevance
“…The first stage of synthesizing the 152 literatures is dividing them according to 2 classifications, literatures from the developed countries and literatures from developing countries as presented in Table 2 & 3. (Afzal et al, 2019;Anish et al, 2019;Bhangale, 2016;Chandramohan et al, 2012;Cindrela Devi & Ananthanarayanan, 2017;Ghumare et al, 2019;Kant, 2018;Muthu Venkata Sekar & Mahalakshmi, 2018;Pai et al, 2018;Raju et al, 2017;Shaktawat & Vadhera, 2017;Shanmuganathan & Baskar, 2015;Sharma et al, 2020;Sharma & Goyal, 2019;Shrivastava et al, 2019;Subramani & Sivakumar, 2018;Velumani & Nampoothiri, 2019;Venkateswaran & Murugasan, 2017;Wanjari & Dobariya, 2016) Malaysia 20 (Abdullah et al, 2018;Afzal et al, 2019;Akram et al, 2017;Asmi et al, 2013;Azis et al, 2013;Hameed Memon et al, 2014;Haslinda et al, 2018;Ismail et al, 2013;Karunakaran et al, 2018;Liew et al, 2019;Memon et al, 2011Memon et al, , 2012Rahman et al, 2013;C. Ramanathan et al, 2012;C.…”
Section: Synthesis Of Resultsmentioning
confidence: 99%
“…The first stage of synthesizing the 152 literatures is dividing them according to 2 classifications, literatures from the developed countries and literatures from developing countries as presented in Table 2 & 3. (Afzal et al, 2019;Anish et al, 2019;Bhangale, 2016;Chandramohan et al, 2012;Cindrela Devi & Ananthanarayanan, 2017;Ghumare et al, 2019;Kant, 2018;Muthu Venkata Sekar & Mahalakshmi, 2018;Pai et al, 2018;Raju et al, 2017;Shaktawat & Vadhera, 2017;Shanmuganathan & Baskar, 2015;Sharma et al, 2020;Sharma & Goyal, 2019;Shrivastava et al, 2019;Subramani & Sivakumar, 2018;Velumani & Nampoothiri, 2019;Venkateswaran & Murugasan, 2017;Wanjari & Dobariya, 2016) Malaysia 20 (Abdullah et al, 2018;Afzal et al, 2019;Akram et al, 2017;Asmi et al, 2013;Azis et al, 2013;Hameed Memon et al, 2014;Haslinda et al, 2018;Ismail et al, 2013;Karunakaran et al, 2018;Liew et al, 2019;Memon et al, 2011Memon et al, , 2012Rahman et al, 2013;C. Ramanathan et al, 2012;C.…”
Section: Synthesis Of Resultsmentioning
confidence: 99%
“…Flyvbjerg et al (2004) highlighted the challenges of attributing the causes of cost escalation if it was linked with ownership alone or whether the geographical location. Another study by Karunakaran et al (2018) claimed geographical location/project topology, inaccurate site investigations are common critical factors that affect cost overrun of infrastructure projects.…”
Section: Literature Review On Factors Affecting Cost Overrun In Road Constructionmentioning
confidence: 99%
“…It is undoubtful that construction industry not only contributes to the growth of economy but also promotes other industries of a country [1]. Construction industry of developed and developing countries has been facing problems to achieve its construction project goals due to the highly unpredictable and variable causes like availability of resources, financial problems, environment and political conditions, contractual relations and low productivity [2]. Successful project must fulfil the prime factors of construction management including cost, time and quality [3,4].…”
Section: Introductionmentioning
confidence: 99%