1980
DOI: 10.1007/bf02305277
|View full text |Cite
|
Sign up to set email alerts
|

Centralized system for the preparation and delivery of cement grouts

Abstract: Kopyshev ]IDC 666.971.4The semiautomatic PTsU-2 grout preparation plant, designed by the State Institute for Specialized Operations of the All-Union Planning, Surveying, and Scientific-Research Institute (Gidrospetsproekt) was used up to 1970 for grouting works in hydraulic engineering (Fig. 1).The grout unit made it possible to prepare any working grouts and pump them into boreholes within a radius up to 200 m from the place of its installation. Among the shortcomings of the PTsU-2 are its large size and low … Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles