“…For the utility turbine case, two gasification trains of equal size were used to provide the required quantity of fuel gas to the turbine. The boost compressor for the gasification air was sized based on the ASPEN/SP simulation and its cost determined from a standard references [23], [24], [25], [26].…”
“…For the utility turbine case, two gasification trains of equal size were used to provide the required quantity of fuel gas to the turbine. The boost compressor for the gasification air was sized based on the ASPEN/SP simulation and its cost determined from a standard references [23], [24], [25], [26].…”
“…Operating and maintenance supplies, overhead and taxes, and insurance were calculated based on literature references. 30,31,32 No state or federal tax credits, nor small producer credits or incentives were assumed for either process. …”
Section: Iv24 Labor Supplies and Overheadmentioning
“…This referred to similar type/scale of plants in Indonesia, e.g. small-scale steam power plant [17]. The electricity tariff was obtained from the sum of electricity selling price and transmission cost.…”
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.