1989
DOI: 10.1007/978-94-011-6544-0
|View full text |Cite
|
Sign up to set email alerts
|

Chemical Engineering Economics

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

2
82
0
2

Year Published

1996
1996
2023
2023

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 144 publications
(86 citation statements)
references
References 3 publications
2
82
0
2
Order By: Relevance
“…For the utility turbine case, two gasification trains of equal size were used to provide the required quantity of fuel gas to the turbine. The boost compressor for the gasification air was sized based on the ASPEN/SP simulation and its cost determined from a standard references [23], [24], [25], [26].…”
Section: Gasification Costsmentioning
confidence: 99%
“…For the utility turbine case, two gasification trains of equal size were used to provide the required quantity of fuel gas to the turbine. The boost compressor for the gasification air was sized based on the ASPEN/SP simulation and its cost determined from a standard references [23], [24], [25], [26].…”
Section: Gasification Costsmentioning
confidence: 99%
“…Operating and maintenance supplies, overhead and taxes, and insurance were calculated based on literature references. 30,31,32 No state or federal tax credits, nor small producer credits or incentives were assumed for either process. …”
Section: Iv24 Labor Supplies and Overheadmentioning
confidence: 99%
“…This referred to similar type/scale of plants in Indonesia, e.g. small-scale steam power plant [17]. The electricity tariff was obtained from the sum of electricity selling price and transmission cost.…”
Section: Economic Calculationmentioning
confidence: 99%