2023
DOI: 10.3390/en16114375
|View full text |Cite
|
Sign up to set email alerts
|

Cluster Partition-Based Voltage Control Combined Day-Ahead Scheduling and Real-Time Control for Distribution Networks

Abstract: Considering the possible overvoltage caused by high-penetration photovoltaics (PVs) connected to the distribution networks (DNs), a cluster partition-based voltage control combined day-ahead scheduling and real-time control for distribution networks is proposed. Firstly, a community detection algorithm utilizing a coupling quality function is introduced to divide the PVs into clusters. Based on the cluster partition, day-ahead scheduling (DAS) is proposed with the objective of minimizing the operating costs of… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 14 publications
0
0
0
Order By: Relevance