Collapsible Landing Sub Deployed with Mechanical Inflow Test Packer Allows Liner Lap Testing and Shoe Track Drill Out in One Trip, Decreasing Costs and Increasing Reliability
Abstract:Liner lap testing operations in the gas fields have evolved to include shoe track drill out operations in the same trip. Typically, a drilling BHA is run and spaced below an inflow test packer to drill out the shoe track to 20ft above the shoe. A landing sub or no-go lands in the liner top at the predetermined bit depth to activate a test packer mechanically. This order of operation exposes the packer elements to debris circulated from drill out operations resulting in damage to the packer elements or incorrec… Show more
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.