Combining BIM and Last Planner on Construction Sites: an Investigation of the Related Challenges

Abstract: The construction industry is facing a gradual but important transformation towards more productivity and collaboration. In this framework, two major approaches are often cited in the literature as having the potential to improve the practices in the industry: Building Information Modeling (BIM) and Lean Construction. Several scientific studies have demonstrated the synergy of these two approaches and very recent research has reported positive results from the use of software applications as support for their i… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
1

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 16 publications
0
4
0
Order By: Relevance
“…This paper is a revised and expanded version of a paper entitled 'Combining BIM and Last Planner on construction sites: an investigation of the related challenges' presented at the 2019's edition of the Creative Construction Conference (Pitti et al, 2019). The purpose of the research work is to investigate the challenges associated with the combination of BIM and Last Planner System through the use of a dedicated software, from the practitioner's standpoint.…”
Section: Introductionmentioning
confidence: 99%
“…This paper is a revised and expanded version of a paper entitled 'Combining BIM and Last Planner on construction sites: an investigation of the related challenges' presented at the 2019's edition of the Creative Construction Conference (Pitti et al, 2019). The purpose of the research work is to investigate the challenges associated with the combination of BIM and Last Planner System through the use of a dedicated software, from the practitioner's standpoint.…”
Section: Introductionmentioning
confidence: 99%
“…Hence, interactions between BIM functionalities and lean thinking principles are hypothesized based on the findings from previous literature for the purpose of uncovering evidence, as shown in Figure 1. To validate these hypothesized interactions, a questionnaire containing both open- and close-ended questions was designed for this purpose (Pitti et al , 2019). The close-ended questions embedded statements that contain evidence of this interaction.…”
Section: Methodsmentioning
confidence: 99%
“…Therefore, the Project Manager should not only train the staff on the new practices to be adopted, but before develop in practice a methodology that integrates everything as proposed by Brioso when written by Brioso X and other more recent articles could be conducted in devising a more precise and different methodology for each Project and Construction Management approach, integrated with the ISO 21500 Standard. The research could also concern how to implement these innovative methodologies within different organizations, from small and medium to large enterprises, so as to gradually stop the opposition of workers of any category of enterprise, used to working for a long time in the same way and therefore reluctant to change [2][3][4].…”
Section: Mini Reviewmentioning
confidence: 99%