2011
DOI: 10.1016/j.cor.2009.12.004
|View full text |Cite
|
Sign up to set email alerts
|

Combining contemporary and traditional project management tools to resolve a project scheduling problem

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
20
0

Year Published

2013
2013
2022
2022

Publication Types

Select...
6
4

Relationship

0
10

Authors

Journals

citations
Cited by 31 publications
(20 citation statements)
references
References 10 publications
0
20
0
Order By: Relevance
“…The Precedence Diagramming Method with GPRs presents anomalous effects that are counterintuitive about the consequences of lengthening or shortening a job (Wiest, 1981;Herbert and Deckro, 2011;Valls and Lino, 2001), changing the concept of the critical path itself. This anomalous effect, called "reverse criticality," is produced when a critical path passes through an activity from finish to start.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The Precedence Diagramming Method with GPRs presents anomalous effects that are counterintuitive about the consequences of lengthening or shortening a job (Wiest, 1981;Herbert and Deckro, 2011;Valls and Lino, 2001), changing the concept of the critical path itself. This anomalous effect, called "reverse criticality," is produced when a critical path passes through an activity from finish to start.…”
Section: Literature Reviewmentioning
confidence: 99%
“…In 1961, Kelly [1] first did research on the TCTP. In the following years, many researches have been done on the TCTP with assumption of deterministic activity durations [2][3][4][5].…”
Section: Introductionmentioning
confidence: 99%
“…First techniques used only constructive heuristics [3,12,15] or mathematical formulations [6,14]. However, over the last years, many metaheuristics approaches have obtained significant results in several areas [1,8,17,19,20,24,25], including validation and comparison with third-party software like [10]. They are particularly applied to the multi-mode version of RCPSP, where a task can be executed in different ways, using different amount of resources [4,5].…”
Section: Literature Reviewmentioning
confidence: 99%