“…In addition, the measurement time depends on station distance, the shorter the distance, the lesser the time required (Sabra et al, 2005b;Gouedard et al, 2008). This method can be equally well used on continental (Yang et al, 2007;Bensen et al, 2009), regional (Szanyi et al, 2013;Ren et al, 2013;Dias et al, 2015), local (Renalier et al, 2010;Stankiewicz et al, 2012) and engineering-geotechnical scale (Picozzi et al, 2009;De Nisco and Nunziata, 2011;Pilz et al, 2012Pilz et al, , 2014.…”