1999
DOI: 10.2172/753091
|View full text |Cite
|
Sign up to set email alerts
|

Commercial thermal distribution systems, Final report for CIEE/CEC

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
6
0

Year Published

2002
2002
2014
2014

Publication Types

Select...
3
1

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(6 citation statements)
references
References 12 publications
0
6
0
Order By: Relevance
“…The EDS project goal is to bridge the gaps in duct system modeling capabilities, and to expand our understanding of duct thermal performance in California's large commercial buildings, by following through on the strategy outlined by Xu et al (1999). As steps toward this goal, the project involves three specific technical objectives:…”
Section: Project Objectivesmentioning
confidence: 99%
“…The EDS project goal is to bridge the gaps in duct system modeling capabilities, and to expand our understanding of duct thermal performance in California's large commercial buildings, by following through on the strategy outlined by Xu et al (1999). As steps toward this goal, the project involves three specific technical objectives:…”
Section: Project Objectivesmentioning
confidence: 99%
“…Xu et al (1999a) have reviewed these capabilities in detail; the following summarizes and expands upon their findings.…”
Section: Doe-21ementioning
confidence: 98%
“…The EDS project goal is to bridge the gaps in duct system modeling capabilities, and to expand our understanding of duct thermal performance in California's large commercial buildings, by following through on the strategy outlined by Xu et al (1999a). As steps toward this goal, the project involves three specific technical objectives:…”
Section: Project Objectivesmentioning
confidence: 99%
See 2 more Smart Citations