DOI: 10.31979/etd.ux6u-375g
|View full text |Cite
|
Sign up to set email alerts
|

Communication patterns in hostage negotiations

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
6
0

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(6 citation statements)
references
References 0 publications
0
6
0
Order By: Relevance
“…One of the salts he isolated was (+)-tris(ethylenediamine)cobalt(III) chloride (+)tartrate pentahydrate. We first became interested in this material when it was the subject of an experiment devised by McClain (1972) for the elementary chemistry laboratory course at Berkeley. We determined the crystal structure because lack of knowledge of it was an embarrassment in explanations to students.…”
mentioning
confidence: 99%
“…One of the salts he isolated was (+)-tris(ethylenediamine)cobalt(III) chloride (+)tartrate pentahydrate. We first became interested in this material when it was the subject of an experiment devised by McClain (1972) for the elementary chemistry laboratory course at Berkeley. We determined the crystal structure because lack of knowledge of it was an embarrassment in explanations to students.…”
mentioning
confidence: 99%
“…Overall estimates of plant construction costs for the Mt. Adams site in Skamania County range from $2,700 -$3100 per net kW (McClain 1990;Yueh 1990), on the assumption that the plant w i l d consist of four 25 MWa modular units to achieve the overall 100 MWa goal. These cost estimates are consistent with prior studies that have shown a range of costs from between $1,550 to $3,778 per net kilowatt for recently built plants (Bloomquist, Geyer, and Sifford 1989;OESI 1991).…”
Section: Iila Construction Cost Estimatesmentioning
confidence: 99%
“…The costs for more remote plants, or those which are more efficient, will likely fall in the higher end of the range. Due to the relative remoteness of the site considered in this study, as well as the existing uncertainty about the quality of .the steam field, it was assumed that well field development costs would be about $1,1OO/kW, while actual plant construction costs would be about $1,7oO/kW (McClain 1990). Pollution control costs for geothermal plants should be similar to other types of power plants.…”
Section: Iila Construction Cost Estimatesmentioning
confidence: 99%
“…Overall estimates of plant conspuction costs for the Mt. Baker site in Whatcom County range from $2,700 -$3100 per net kW (McClain 1990;Yueh 1990), on the assumption that the plant would consist of four 25 MWa modular units to achieve the overall 100 MWa goal. These cost estimates are consistent with prior studies that have shown a range of costs from between $1,550 to $3,778 per net kilowatt for recently built plants (Bloomquist, Geyer, and Sifford 1989;OESI 1991).…”
Section: Ii1a Construction Cost Estimatesmentioning
confidence: 99%