2021
DOI: 10.1080/15578771.2021.2013998
|View full text |Cite
|
Sign up to set email alerts
|

Comparing Cost, Schedule, and Quality of CM/GC and DBB Project Delivery for Repetitive Commercial Construction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 26 publications
0
2
0
Order By: Relevance
“…Some major project delivery methods in use are design-build (DB); construction management (CM); public-private partnerships (PPPs) and integrated project delivery (IPD) (Ashcraft, 2022;Patterson et al, 2021;CMAA, 2012). The DB is where the owner contracts a single entity (design-build contractor) to be responsible for both the project design and construction.…”
Section: Literature Review 21 Backgroundmentioning
confidence: 99%
See 1 more Smart Citation
“…Some major project delivery methods in use are design-build (DB); construction management (CM); public-private partnerships (PPPs) and integrated project delivery (IPD) (Ashcraft, 2022;Patterson et al, 2021;CMAA, 2012). The DB is where the owner contracts a single entity (design-build contractor) to be responsible for both the project design and construction.…”
Section: Literature Review 21 Backgroundmentioning
confidence: 99%
“…The PPPs is where based on the collaboration, the private sector takes on the responsibility to deliver the project while the public sector retains ownership. Other project delivery methods exist but they are variations of these four (Patterson et al, 2021;Aldossari et al, 2021). While CPD accounts for about 60% of usage in the industry globally, CM accounts for 25%, DB accounts for 15% and IPD accounts for less than 1% usage (Aldossari et al, 2021;CMAA, 2012).…”
Section: Literature Review 21 Backgroundmentioning
confidence: 99%