Volume 1: Risk Assessment and Management; Emerging Issues and Innovative Projects; Operations and Maintenance; Corrosion and In 1998
DOI: 10.1115/ipc1998-2070
|View full text |Cite
|
Sign up to set email alerts
|

Comparison Between In-Line Crack Detection and Hydrostatic Testing in IPL’s Line 3

Abstract: The BG Elastic Wave in-line crack detection vehicle was used to inspect 213.5 km (133 miles) of Interprovincial Pipe Line Inc’s (IPL’s) Line 3. Rigorous analysis of the inspection data, concentrated on the seam weld and surrounding region, identified 73 sites for excavation. Pressure retaining sleeves were fitted at 17 locations. Of these, the most severe defect noted was a 25 mm (1 inch), 40% through wall long seam shrinkage crack. This was the only feature exceeding a size predicted to possibl… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles