Comparison of cost estimation methods in power wheeling for Java-Bali interconnection system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
2
0
1

Year Published

2019
2019
2024
2024

Publication Types

Select...
2
2

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 4 publications
0
2
0
1
Order By: Relevance
“…The MW-mile or MW-km method is a technique employed to This method calculates the active power flow over the entire distribution line. The power flow is multiplied by the line length (L k ) and the cost per distribution line length (C k ), as presented in (2) [10], [21], [22].…”
Section: Power Wheelingmentioning
confidence: 99%
See 1 more Smart Citation
“…The MW-mile or MW-km method is a technique employed to This method calculates the active power flow over the entire distribution line. The power flow is multiplied by the line length (L k ) and the cost per distribution line length (C k ), as presented in (2) [10], [21], [22].…”
Section: Power Wheelingmentioning
confidence: 99%
“…The implementation of the power wheeling scheme imposes network rental costs on business actors. Reference [10] has compared power flow-based network rental cost calculation methods, namely MW-mile, MVA-mile, and current base methods on the implementation of power wheeling in the Java-Bali interconnection system. The calculation methods of MW-mile and MVA-mile network rental costs had more realistic results than the current base method based on electricity prices in Indonesia.…”
Section: Introductionmentioning
confidence: 99%
“…Penelitian ini juga menjelaskan isu-isu utama pada implementasi setiap metode di industri. Adapun studi kasus implementasi wheeling pada Sistem Jamali dilakukan pada [26]. Pada penelitian ini, dibandingkan metode perhitungan wheeling dengan power flow dan tanpa power flow.…”
Section: Metode Perhitunganunclassified