2020
DOI: 10.1109/access.2020.3001134
|View full text |Cite
|
Sign up to set email alerts
|

Complex Equipment Remanufacturing Schedule Management Based on Multi-Layer Graphic Evaluation and Review Technique Network and Critical Chain Method

Abstract: In order to solve the problem of project schedule delays caused by resource conflicts and uncertainty of the environment, work duration, and logical relationship, this paper proposed CCPSP (critical chain project scheduling problem) optimal scheduling model which integrates CCM (critical chain method) and multi-level GERT (graphical evaluation and review technique) network. DEACA (differential evolution ant colony algorithm) is designed to solve the problem, in which DE (differential evolution algorithm) is us… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 9 publications
0
3
0
Order By: Relevance
“…In this way, it is possible to predict the time required for the complete completion of a project. This method is very helpful in sustaining the projects more effectively and efficiently [14]. The biggest advantage of this technique is that it can take into account the uncertainties in the end times of the activities.…”
Section: Introductionmentioning
confidence: 99%
“…In this way, it is possible to predict the time required for the complete completion of a project. This method is very helpful in sustaining the projects more effectively and efficiently [14]. The biggest advantage of this technique is that it can take into account the uncertainties in the end times of the activities.…”
Section: Introductionmentioning
confidence: 99%
“…The Gantt chart, invented by Henry L. Gantt in the 1930s, is considered an early tool and method for project management. After that, Critical Path Method (CPM) [4,5], Program Evaluation and Review Technique (PERT) [6,7], Graphic Evaluation and Review Technique (GERT) [8,9], Work Breakdown Structure (WBS) [10][11][12] and Earned Value Management (EVM) [13][14][15] methods in the field of project management were born.…”
Section: Related Work 21 Project and Project Group Managementmentioning
confidence: 99%
“…Many factors can seriously affect the utilization and sustainability of production lines. For instance, the rapidly changing market needs and unexpected machine failures can significantly reduce the efficiency and performance of the production system [13]. For the complex job-shop manufacturing system, the job-shop scheduling problem becomes one of the most important production scheduling problems in smart manufacturing areas.…”
Section: Introductionmentioning
confidence: 99%