2020
DOI: 10.1007/978-3-030-51295-8_43
|View full text |Cite
|
Sign up to set email alerts
|

Conceptual Framework for Integrating Cost Estimating and Scheduling with BIM

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
3
1

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 14 publications
0
2
0
Order By: Relevance
“…The four assumptions established were: Thus, with respect to the elaboration of the four propositions, the assumption was that the integration of processes should be conducted one by one, thus adopting the pillars of knowledge management, i.e., people, processes, and technology, as a fundamental basis, and the integration should occur using the WBS as a standard parameter. A discussion on the conceptual framework is presented in the work of Santos, Costa and Ferreira (2021).…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…The four assumptions established were: Thus, with respect to the elaboration of the four propositions, the assumption was that the integration of processes should be conducted one by one, thus adopting the pillars of knowledge management, i.e., people, processes, and technology, as a fundamental basis, and the integration should occur using the WBS as a standard parameter. A discussion on the conceptual framework is presented in the work of Santos, Costa and Ferreira (2021).…”
Section: Methodsmentioning
confidence: 99%
“…In a previous work, Santos, Costa and Ferreira (2021) discussed the main problems found in Project 1 and Project 2 regarding the company object of this study. The identified problems are summarized as follows.…”
Section: Awareness Of Problem: Studying Project 1 and Project 2 Information Workflowmentioning
confidence: 97%