“…The stages have been highlighted as concrete production at the batching plant or in-situ at the site, transportation through transit mixers, its placing using vibrators and formwork, curing of concrete, and post-construction structural health monitoring stages. Non curing (Juliafad et al, 2019) Early formwork removal (Rockstroh, 2018;Samouh et al, 2015) Plastic shrinkage (Bella et al, 2017;Ghourchian et al, 2018) Thermal cracking (Bella et al, 2017;Zhao et al, 2019) Early age cracking (Khan, Xu, Castel, & Gilbert, 2018;Safiuddin, Kaish, Woon, & Raman, 2018) Autogenous and drying shrinkage (Gilbert, Castel, Khan, South, & Mohammadi, 2018) 5 Post Construction Reinforcement and concrete corrosion (Shi, 2018;Zhou et al, 2018) Internal crack occurrence and propagation (Cai, Fu, Shang, & Shi, 2018;Dung, 2019) Moisture sensor is placed in the concrete − to monitor water content (to prevent excess addition of water during transportation), workability, and giving realtime data of the chemical characteristics of concrete.…”