2022
DOI: 10.1007/s10489-022-04097-9
|View full text |Cite
|
Sign up to set email alerts
|

Configuring a seru production system to match supply with volatile demand

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
4
1

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 37 publications
0
1
0
Order By: Relevance
“…Previous studies have viewed rotating serus as a black box, as seen in the works of Gai et al (2022), Liu et al (2022), Zhan et al (2023), Zhang, Song, Gong, et al (2022a, 2022b), Zhang, Wang, Song, et al (2022), Zhang, Song, Huang, et al (2022), and Li et al (2023). This study is the first to open the black box by analyzing the inside mechanisms of rotating serus .…”
Section: Discussionmentioning
confidence: 99%
“…Previous studies have viewed rotating serus as a black box, as seen in the works of Gai et al (2022), Liu et al (2022), Zhan et al (2023), Zhang, Song, Gong, et al (2022a, 2022b), Zhang, Wang, Song, et al (2022), Zhang, Song, Huang, et al (2022), and Li et al (2023). This study is the first to open the black box by analyzing the inside mechanisms of rotating serus .…”
Section: Discussionmentioning
confidence: 99%