2022
DOI: 10.1108/sasbe-08-2021-0151
|View full text |Cite
|
Sign up to set email alerts
|

Consolidating loads for sustainable construction in New Zealand: a literature review-based research framework

Abstract: PurposeA long-term collaborative public water infrastructure procurement contract in New Zealand adopts “Enterprise Alliance” delivery (strategy) with a Construction Consolidation Centre (CCC) (operational) logistics solution. New Zealand's unique spatial, market, regulatory and economic circumstances present a research gap pertaining to the sustainability impacts of the combinatory implementation. The paper suggests a literature review-based research framework for examining these.Design/methodology/approachSy… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 6 publications
(2 citation statements)
references
References 44 publications
0
2
0
Order By: Relevance
“…A diagnosis was made in the Provincial Municipality of Puno of the strategic processes, operational and support frameworks for engineering projects at the design level [7], identifying Peru in the context of investment. Statistics were made on the status of contract works tendered by the Municipality from 2016 to 2020, with the term extensions in most of these projects as a pathology [8]. In order to have results of the current management of the BIM methodology that the officials and servers of the Provincial Municipality of Puno have [9], I use the method of the Survey of 17 people between officials and public servants who work in the areas related to design, construction, operation and works maintenance [10].…”
Section: Introductionmentioning
confidence: 99%
“…A diagnosis was made in the Provincial Municipality of Puno of the strategic processes, operational and support frameworks for engineering projects at the design level [7], identifying Peru in the context of investment. Statistics were made on the status of contract works tendered by the Municipality from 2016 to 2020, with the term extensions in most of these projects as a pathology [8]. In order to have results of the current management of the BIM methodology that the officials and servers of the Provincial Municipality of Puno have [9], I use the method of the Survey of 17 people between officials and public servants who work in the areas related to design, construction, operation and works maintenance [10].…”
Section: Introductionmentioning
confidence: 99%
“…A NZ$2.4bn decade-long Watercare (Auckland) programme of delivering water infrastructure adopts program alliancing (based on UK Project 13 precedence) as a strategic solution and a Construction Consolidation Centre (CCC) as an operational vehicle. Dhawan et al (2022) suggest a research framework and examine an appropriate research design to exploit this unique contextual research opportunity arising from the specific geography of Auckland and associated logistical planning constraints. Premier et al (2022) focus on solar-powered (smart) urban furniture and aim to provide classification, understand the main problems related to their adoption, and future focus areas of design-led research.…”
mentioning
confidence: 99%