2019
DOI: 10.1155/2019/3607574
|View full text |Cite
|
Sign up to set email alerts
|

Constraint Embankment Construction to Prevent the Collapse of Underground Caves

Abstract: Dozens of underground karst caves were found before constructing the Changli highway. The thickness-to-span ratio of nearly half of the caves is less than 0.05, and the greatest ratio is only 0.35, far less than the value demanded by local construction specifications (0.8). The caves located at K50 + 700 and K178 + 800 are by far the only two caves that have become unstable. Only one passive measure was taken when constructing the highway, i.e., building 0.5 m thick continuous reinforced concrete slabs above t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 34 publications
0
0
0
Order By: Relevance