Construction Change Order Management Project Support System Utilizing Delphi Method

Abstract: Change orders are a major challenge in the construction industry due to the associated time and cost impacts. Thus, managing change effectively assists in alleviating cost overruns and delays. Avoiding change orders and controlling them during project phases requires comprehensive research on the factors affecting the change orders management (COM) performance. This study contributes to existing knowledge by introducing a COM performance measurement framework to help construction professionals evaluate, track,… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 8 publications
(5 citation statements)
references
References 96 publications
0
5
0
Order By: Relevance
“…In addition, it uses anonymity to avoid group think and the possibility of gathering qualitative and quantitative data to enrich the analysis process ( Almenara and Moro, 2014 ; Reguant Álvarez and Torrado Fonseca, 2016 ; López Gómez, 2018 ). The Delphi method is widely used for organizational studies ( Bhardwaj and Patnaik, 2019 ; García-Vidal et al, 2021 ; Kerpedzhiev et al, 2021 ; Vax et al, 2021 ) and project management research ( Cafiso et al, 2013 ; Gajić and Palčič, 2019 ; Naji et al, 2022 ), including areas as different as civil engineering ( Kermanshachi et al, 2020 ), health ( Nasa et al, 2021 ), technology ( Andersen, 2022 ), among many others.…”
Section: Methodsmentioning
confidence: 99%
“…In addition, it uses anonymity to avoid group think and the possibility of gathering qualitative and quantitative data to enrich the analysis process ( Almenara and Moro, 2014 ; Reguant Álvarez and Torrado Fonseca, 2016 ; López Gómez, 2018 ). The Delphi method is widely used for organizational studies ( Bhardwaj and Patnaik, 2019 ; García-Vidal et al, 2021 ; Kerpedzhiev et al, 2021 ; Vax et al, 2021 ) and project management research ( Cafiso et al, 2013 ; Gajić and Palčič, 2019 ; Naji et al, 2022 ), including areas as different as civil engineering ( Kermanshachi et al, 2020 ), health ( Nasa et al, 2021 ), technology ( Andersen, 2022 ), among many others.…”
Section: Methodsmentioning
confidence: 99%
“…The authors followed the case study methodology in developing this research paper, case studies are suitable for studying phenomena in their real-life contexts where researchers have not previously studied (Naji et al, 2022). ASHGHAL introduced Lean Construction to enhance infrastructure projects performance and delivery.…”
Section: Methodsmentioning
confidence: 99%
“…Some of the reported strategies to ensure the proper implementation of safety and environmental laws in construction projects include the use of Building Information Management (BIM) systems to ensure project compliance with the requirements of safety management, by ensuring accident prevention and avoiding personal injury or property damage, as well as environmental management, which is necessary to confirm that projects follow laws and regulations relating to the environment [61]. Additionally, the reported mitigation strategies in the literature that focused on tackling change orders were mainly divided into Design Management (e.g., sufficient stipulated time for design and establishment of project management plan), Quality Management (e.g., periodic reviews of project requirements), Documentation Management (e.g., reviewing the sufficiency of contract documents for changes), Financial Management (e.g., detailed breakdowns and pricing of change order components), Dispute Resolution Management (e.g., establishment of a claims and disputes resolution system as set out in the contract), Communication and Relationship Management (e.g., regular meetings between contracting parties to discuss changes), and Procurement Management (e.g., early identification of lead items during design stage), to name a few [62][63][64][65][66].…”
Section: Mitigation Strategies To Tackle Change Orders In Constructio...mentioning
confidence: 99%