2020
DOI: 10.1007/978-3-030-48465-1_97
|View full text |Cite
|
Sign up to set email alerts
|

Contingency Use and Project Delivery Influence on Infrastructure Project Risk Assessment

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 12 publications
0
1
0
Order By: Relevance
“…The basic idea is built based on the general contingency theory (Aljawder and Davis, 2013), which advocates that project control activities are critical for a project's success. Project risk management influences project performance and business success (Zwikael et al, 2014;Diab and Mehany, 2021). The organization benefits by implementing project risk management since it achieves greater project performance and business success through creating business value.…”
Section: Hypothesesmentioning
confidence: 99%
“…The basic idea is built based on the general contingency theory (Aljawder and Davis, 2013), which advocates that project control activities are critical for a project's success. Project risk management influences project performance and business success (Zwikael et al, 2014;Diab and Mehany, 2021). The organization benefits by implementing project risk management since it achieves greater project performance and business success through creating business value.…”
Section: Hypothesesmentioning
confidence: 99%
“…Additionally, physical constraints and human factors also contribute to the uncertainty in BR projects. Physical constraints include access to the site, inadequate space for working or storage of materials, unforeseen site conditions, the unclear scope of work, difficulty in matching new materials with existing materials and difficulty in obtaining construction materials (Rahmat 2008;Vaysburd et al 2014;Aziz and Abdel-Hakam 2016;Noori and Mokariantabari 2019b;Diab and Mehany 2021;Ranasinghe et al 2021). However, physical constraints can be increased further due to human factors when an organisation or the tenants need to remain in an existing building while BR work is undertaken (Nutt et al 1998;Holm 2000).…”
Section: Introductionmentioning
confidence: 99%