Contractor-Led Critical Design Management Factors in High-Rise Building Projects Involving Multinational Design Teams

Abstract: High-rise building projects (HRPs) are comprised of various complex design elements. The involvement of a multinational design team increases design-related issues for contractors, which must be managed during the construction stage. Thus, contractors need to understand how appropriate design management can positively affect project performance and their profit. Identification of critical design management factors (CDMFs) can provide appropriate decisionmaking support for contractors, including how limited res… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 14 publications
(5 citation statements)
references
References 81 publications
0
5
0
Order By: Relevance
“…At this point, it is not a human, but a landbased robot that invades the leakage area, and the cause can be found out. People can operate remotely through the robot arm of the land robot [21,22]. (6) Agricultural application: equipped with a special camera, it can not only obtain low altitude information of diseases, pests, and weeds but also drive small-scale pests and diseases.…”
Section: Application Fields Of the Firefighting Robot Controlmentioning
confidence: 99%
“…At this point, it is not a human, but a landbased robot that invades the leakage area, and the cause can be found out. People can operate remotely through the robot arm of the land robot [21,22]. (6) Agricultural application: equipped with a special camera, it can not only obtain low altitude information of diseases, pests, and weeds but also drive small-scale pests and diseases.…”
Section: Application Fields Of the Firefighting Robot Controlmentioning
confidence: 99%
“…Project document reviews (S 25 ) can enable EPC contractors to identify problems with documents including cost reports, drawings, and specifications in time and better coordinate with the implementation of design optimization [40]. Errors in the materials provided by the owner (S 26 ) [41] and the approval efficiency of design documents (S 27 ) [40] may affect the implementation of design optimization.…”
Section: Establishment Of the Influencing Factor Systemmentioning
confidence: 99%
“…(peer-to-peer) technology (Chen and Hou 2014). The association of BIM with PMIS integrates miscellaneous design information, which is crucial for building construction (Whang et al 2016). However, the implementation of BIM interface systems involves technical, administrative, and legal issues (Singh et al 2011).…”
Section: Bim Workflowmentioning
confidence: 99%