Controlling the schedule risk in green building projects: Buffer management framework with activity dependence

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
6
1
1

Relationship

0
8

Authors

Journals

citations
Cited by 24 publications
(8 citation statements)
references
References 48 publications
0
8
0
Order By: Relevance
“…It is also seen that in the US extension of schedules is a weak barrier due to adoption of an integrated design mechanism which allocates enough time for feedback and revision. Xiao, Bie, and Bai in (2021) propose an enhanced buffer management method to dynamically control the delay of schedule risk in GB projects.…”
Section: Discussionmentioning
confidence: 99%
“…It is also seen that in the US extension of schedules is a weak barrier due to adoption of an integrated design mechanism which allocates enough time for feedback and revision. Xiao, Bie, and Bai in (2021) propose an enhanced buffer management method to dynamically control the delay of schedule risk in GB projects.…”
Section: Discussionmentioning
confidence: 99%
“…The number of neurons is represented by A, B, and N in the input, output, and hidden layers, respectively. Constant C∈ [1,10].According to the established model, there are 20 neurons in the input layer, that is, A=20, and 1 neuron in the output layer, that is, B=1.Then, N∈ [6,15].…”
Section: Genetic Algorithm To Optimize Bp Neural Network 31 Bp Neural...mentioning
confidence: 99%
“…Yang et al [5]used the social network model to study the risk of stakeholders in green building projects. Lei et al [6]dynamic the schedule risk of green building projects by constructing an improved buffer management method. Guan et al [7]studied the relationship between the risk of green building projects by using the interpretative structural model.…”
Section: Introductionmentioning
confidence: 99%
“…They employ a dynamic buffer control method based on colour management to order raw materials according to real-time market demand, thus saving inventory costs. Xiao et al. (2021) propose an improved buffer management method to dynamically control the schedule risk in green building projects while helping to reduce greenhouse gas emissions and environmental impacts.…”
Section: Literature Reviewmentioning
confidence: 99%