2022
DOI: 10.1016/j.apenergy.2022.120116
|View full text |Cite
|
Sign up to set email alerts
|

Coordination control of distributed generators and load resources for frequency restoration in isolated urban microgrids

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
14
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
4
1
1
1

Relationship

1
6

Authors

Journals

citations
Cited by 45 publications
(14 citation statements)
references
References 44 publications
0
14
0
Order By: Relevance
“…Al [24]. Although other linear equations have been presented in the literature, e.g., [21], [23], [25], [32], [33], [34], they are variations of these two basic models. Below, the consensus frequency and voltage controllers of Bidram [22] and Simpson [24] are presented, in two different sub-sections.…”
Section: Consensus Controlmentioning
confidence: 99%
See 1 more Smart Citation
“…Al [24]. Although other linear equations have been presented in the literature, e.g., [21], [23], [25], [32], [33], [34], they are variations of these two basic models. Below, the consensus frequency and voltage controllers of Bidram [22] and Simpson [24] are presented, in two different sub-sections.…”
Section: Consensus Controlmentioning
confidence: 99%
“…Finally, (36) is derived from (35), in a similar sense as (32), where 𝒅𝑽 and 𝒅𝑸 𝑮 are the required variation of voltage and reactive power of DGs so that both (35) and power flow equations are fulfilled.…”
Section: Calculation Of Dg Reactive Powermentioning
confidence: 99%
“…For protection 1, due to the shunt effect of distributed generation, the short-circuit current flowing through protection 1 is reduced, which may lead to the failure of the time-limited current quick-break protection of protection 1 when it is used as the backup protection of the lower line. (3) When a fault occurs on a line that does not contain a distributed power source, for example, between the line FG, the short-circuit current will flow through the protections 5 and 6, which may cause the protection to malfunction, and the line AF in normal operation at this time will cause power failure [7] .…”
Section: Access To Distributed Power Supply In the Middle Of 10kv Pow...mentioning
confidence: 99%
“…The contributions of this paper lie in the following: The model adds energy storage and interruptible load to simulate the increasingly complex electricity consumption scenarios. It also considers the satisfaction level of electricity consumption on the user side 32 Based on the Wasserstein metric, an ambiguity set is established to reflect the probabilistic distribution of wind power uncertainty. An ambiguity set preprocessing method is proposed to portray the ambiguity set's probability distribution more clearly. …”
Section: Introductionmentioning
confidence: 99%
“…It also considers the satisfaction level of electricity consumption on the user side. 32 2. Based on the Wasserstein metric, an ambiguity set is established to reflect the probabilistic distribution of wind power uncertainty.…”
mentioning
confidence: 99%