2022
DOI: 10.2172/1847876
|View full text |Cite
|
Sign up to set email alerts
|

Cost Update: Commercial and Advanced Heliostat Collectors

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
20
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 12 publications
(20 citation statements)
references
References 17 publications
0
20
0
Order By: Relevance
“…• Heliostat installation cost [12] • Heliostat technical performance, which includes a variety of metrics such as solar field layout, heliostat optical performance, heliostat degradation, and control strategy [13] • Heliostat field operations and maintenance (O&M) [14]- [16] • Minimized commercial deployment risks.…”
Section: Roadmap Vision and Objectivesmentioning
confidence: 99%
See 4 more Smart Citations
“…• Heliostat installation cost [12] • Heliostat technical performance, which includes a variety of metrics such as solar field layout, heliostat optical performance, heliostat degradation, and control strategy [13] • Heliostat field operations and maintenance (O&M) [14]- [16] • Minimized commercial deployment risks.…”
Section: Roadmap Vision and Objectivesmentioning
confidence: 99%
“…The Stellio design, developed by sbp sonne [18], is employed in a newly constructed 50-MW Hami pilot plant in China [19]. NREL has conducted a bottom-up analysis of the design and verified projected costs against sbp's assessment [20]. A design schematic and an installed heliostat are illustrated in Figure 5.…”
Section: Example Heliostat Designmentioning
confidence: 99%
See 3 more Smart Citations