2012
DOI: 10.1063/1.4753905
|View full text |Cite
|
Sign up to set email alerts
|

CPV hybrid system in ISFOC building, first results

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2013
2013
2013
2013

Publication Types

Select...
3
1

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…An air conditioning and heating system servicing the offices has been connected to the hybrid system, acting as a load. A preliminary study on this system was carried out by the authors . As a result of this study, several modifications have been performed to the system.…”
Section: Introductionmentioning
confidence: 99%
“…An air conditioning and heating system servicing the offices has been connected to the hybrid system, acting as a load. A preliminary study on this system was carried out by the authors . As a result of this study, several modifications have been performed to the system.…”
Section: Introductionmentioning
confidence: 99%
“…Sophisticated control systems of small-scale CPV power plants are subject of the related works [2] and [3]. Our previous work focuses in particular on new approaches of communication systems [4].…”
Section: Introductionmentioning
confidence: 99%
“…During the development of the project two more publications were done. In Trujillo et al (2012), an introduction to the project and the different elements that the installation possesses are described. In Trujillo et al (2013), the first results of the project are published following the objective of maximizing the self-consumption of the local resources with the ADSM controller developed.…”
Section: Discussionmentioning
confidence: 99%