2017 International Conference on High Voltage Engineering and Power Systems (ICHVEPS) 2017
DOI: 10.1109/ichveps.2017.8225919
|View full text |Cite
|
Sign up to set email alerts
|

Criteria for integration of intermittent renewable energy to the Java Bali Grid

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
3
3

Relationship

0
6

Authors

Journals

citations
Cited by 13 publications
(3 citation statements)
references
References 2 publications
0
3
0
Order By: Relevance
“…The inter-area from the most western to easternmost parts is interconnected via a 150 kV transmission line (red line). The Java power system is interconnected to the Bali system by 150 kV submarine cables (red line) [37]. The Java-Bali power system is operated by the transmission system operator (TSO) in Gandul, West Java.…”
Section: Java-bali Power Systemmentioning
confidence: 99%
See 2 more Smart Citations
“…The inter-area from the most western to easternmost parts is interconnected via a 150 kV transmission line (red line). The Java power system is interconnected to the Bali system by 150 kV submarine cables (red line) [37]. The Java-Bali power system is operated by the transmission system operator (TSO) in Gandul, West Java.…”
Section: Java-bali Power Systemmentioning
confidence: 99%
“…power system is interconnected to the Bali system by 150 kV submarine cables (red line) [37]. The Java-Bali power system is operated by the transmission system operator (TSO) in Gandul, West Java.…”
Section: Java-bali Power Systemmentioning
confidence: 99%
See 1 more Smart Citation