Critical risk factors affecting the implementation of PPP waste-to-energy projects in China

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

2
66
0
1

Year Published

2019
2019
2022
2022

Publication Types

Select...
4
1
1

Relationship

1
5

Authors

Journals

citations
Cited by 101 publications
(69 citation statements)
references
References 29 publications
2
66
0
1
Order By: Relevance
“…Many studies have been conducted of the risk identification of PPP WTE incineration projects in China using literature reviews, case studies, questionnaire surveys, etc Consistent with previous findings, a range of risk factors, such as public opposition risk, environmental risk, and government decision‐making risk, in PPP WTE incineration projects has achieved the consensus of previous findings. However, the differences in the identified risk factors lie in the following four aspects.…”
Section: Resultsmentioning
confidence: 65%
See 3 more Smart Citations
“…Many studies have been conducted of the risk identification of PPP WTE incineration projects in China using literature reviews, case studies, questionnaire surveys, etc Consistent with previous findings, a range of risk factors, such as public opposition risk, environmental risk, and government decision‐making risk, in PPP WTE incineration projects has achieved the consensus of previous findings. However, the differences in the identified risk factors lie in the following four aspects.…”
Section: Resultsmentioning
confidence: 65%
“…Therefore, lack of supporting infrastructure is identified as one of the critical risk factors by experts, which currently might not frequently occur. Moreover, the effective operation of a WTE incineration plant requires the support of various types of infrastructures provided by the government, such as municipal facilities, roads, water supply and drainage pipeline engineering, gas pipeline engineering, communication, and so forth . If these are not available in a timely manner or at fair rates due to inadequate preplanning, financial problems, and spatial constraints, the performance of incineration plants will be significantly affected…”
Section: Resultsmentioning
confidence: 99%
See 2 more Smart Citations
“…Assim, compromete-se o grau de detalhamento e a forma de condução das PMIs. Segundo Xu et al (2015), para evitar que os contratos falhem, sejam renegociados ou interrompidos, é necessária minuciosa avaliação do risco de PPP/PFI.…”
Section: Alocação Eficiente De Riscosunclassified