2021
DOI: 10.1107/s2056989021007349
|View full text |Cite
|
Sign up to set email alerts
|

Crystal structure and Hirshfeld surface analysis of (2Z)-N,N-dimethyl-2-(pentafluorophenyl)-2-(2-phenylhydrazin-1-ylidene)acetamide

Abstract: In the title compound, C16H12F5N3O, the dihedral angle between the aromatic rings is 31.84 (8)°. In the crystal, the molecules are linked into dimers possessing crystallographic twofold symmetry by pairwise N—H...O hydrogen bonds and weak C—H...O hydrogen bonds and aromatic π–π stacking interactions link the dimers into a three-dimensional network. A Hirshfeld surface analysis indicates that the most important contributions to the crystal packing are from F...H/H...F (41.1%), H...H (21.8%), C...H/H...C (9.7%) … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 18 publications
0
1
0
Order By: Relevance
“…It should be noted that inaccurate high reservoir pressure predictions can have significant implications across economic, environmental, and safety domains. Economically, such inaccuracies can lead to unexpected drilling challenges, increasing costs due to the need for more equipment, materials, and extended operational time to manage high-pressure formations (27)(28)(29)(30) . This also causes production delays, impacting project timelines and potentially leading to financial losses from reduced productivity, along with a misallocation of resources as operational plans and budgets need adjustment.…”
Section: Discussionmentioning
confidence: 99%
“…It should be noted that inaccurate high reservoir pressure predictions can have significant implications across economic, environmental, and safety domains. Economically, such inaccuracies can lead to unexpected drilling challenges, increasing costs due to the need for more equipment, materials, and extended operational time to manage high-pressure formations (27)(28)(29)(30) . This also causes production delays, impacting project timelines and potentially leading to financial losses from reduced productivity, along with a misallocation of resources as operational plans and budgets need adjustment.…”
Section: Discussionmentioning
confidence: 99%