2016
DOI: 10.14359/51688195
|View full text |Cite
|
Sign up to set email alerts
|

Cyclic Loading Test for Cast-in-Place Concrete-Filled Hollow Columns

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
5
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 13 publications
(5 citation statements)
references
References 4 publications
0
5
0
Order By: Relevance
“…Hence, large-sized concrete members are preferred to increase the stiffness of the structure, as well as to control deflection and vibration. In the construction of such buildings, the use of precast concrete (PC) structures may be beneficial because the onsite work, construction period, and costs can be significantly reduced when compared to cast-in-place reinforced concrete (RC) structures (Kim et al, 2016; Park, 1995). However, the heavy weight of the PC members causes transportation and lifting difficult.…”
Section: Introductionmentioning
confidence: 99%
See 3 more Smart Citations
“…Hence, large-sized concrete members are preferred to increase the stiffness of the structure, as well as to control deflection and vibration. In the construction of such buildings, the use of precast concrete (PC) structures may be beneficial because the onsite work, construction period, and costs can be significantly reduced when compared to cast-in-place reinforced concrete (RC) structures (Kim et al, 2016; Park, 1995). However, the heavy weight of the PC members causes transportation and lifting difficult.…”
Section: Introductionmentioning
confidence: 99%
“…In order to avoid the difficulty of installing and removing the internal mold and to improve the production efficiency, various methods such as centrifugal casting method (Choi et al, 2000; Hamada et al, 1998; Hosoya et al, 2001; Hosoya and Asano, 2000; Hosoya and Hukuyama, 2008; Masuda and Yoshioka, 1994; Shan et al, 2017; Zhang et al, 2018a), multiple internal molds (Ding et al, 2017; Wu et al, 2018; Xiao et al, 2012, 2013; Zhang et al, 2009), sequential concrete placements rotating a section (Iso et al, 1999; Kim et al, 2016; Lim et al, 2014), and thin steel plate internal molds (Kim et al, 2017; Lee et al, 2014; Park et al, 2015) have been adopted to fabricate PC tubes. All these methods could improve the production efficiency and structural safety.…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations
“…On the basis of the test results, design considerations for beam-CEFT column joints were recommended. Kim et.al [4] had conducted the research about the title of cyclic loading test for concrete-filled hollow precast concrete columns produced by using a new fabrication method. In this research, a new fabrication method is proposed for concretefilled hollow precast concrete columns (HPCC) as shown in Fig.…”
Section: Introductionmentioning
confidence: 99%