D0 Silicon Upgrade: Upgrade Piping Loads on Cleanroom Roof

Abstract: Fott.Colt.~E.,--rr'J ESc:, . uS'-p\-r OW~ R\ ~K.-"R. Ru<.,t..l~~( \\-\~-q5 \ The proposed piping layout for the DO upgrade will run along the south wall of DAB. The cryogenic service pipe runs above the upper and lower cleanroom roofs and will need to be supported by the roofs'beams. Calculations were done to determine the stresses in the I-beams created by the existing and additional loads due to the upgrade.Refer to drawing no. 3823 .115-ME-317283 for drawings ofthe piping layout. Figure 1 shows the "plan vi… Show more