“…Moreover, SC production planning and control literature, excepting some cases (Acar & Atadeniz, 2015), misses considering transportation performances (Olhager, 2013). In many cases, this is not a mistake, because the SCP models analysed are different on the timing of transportation but they do not differ in the structure transportation are done and so transportation costs result as not differential between SCP models (Georgiadis & Athanasiou, 2013;Ogier, Chan, Chung, Cung, & Boissière, 2015). However, when SCP are much different, transportation could have significant impact, as in the case of two 'distant' SCP models as LEAN-P and VIS-P.…”