All Days 2011
DOI: 10.4043/22078-ms
|View full text |Cite
|
Sign up to set email alerts
|

Design Considerations for an Arctic Intervention Vessel

Abstract: This paper describes ongoing work to tailor make an offshore intervention vessel for operations off the coast of Norway and in Svalbard waters. Operational requirements have been specified using subject matter experts from oil and shipping industries, equipment manufacturers and research organizations. A business case has been prepared for a vessel operating from a base in Northern Norway and serving two potential fields, one close to the coast of Finnmark (Goliat field) and the other one in the Olga Basin eas… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2013
2013
2015
2015

Publication Types

Select...
4

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Incorporated in the design was also high focus on safe effective work environment in cold climate through fully enclosed module handling tower and storage space for modules (as shown in Figure 1). Among the parameters, tools and methods that have been considered along the iterative process of designing the CIVArctic vessel are (Berg et al, 2011):…”
Section: Vessel Designmentioning
confidence: 99%
“…Incorporated in the design was also high focus on safe effective work environment in cold climate through fully enclosed module handling tower and storage space for modules (as shown in Figure 1). Among the parameters, tools and methods that have been considered along the iterative process of designing the CIVArctic vessel are (Berg et al, 2011):…”
Section: Vessel Designmentioning
confidence: 99%