11th Annual North American Waste-to-Energy Conference 2003
DOI: 10.1115/nawtec11-1687
|View full text |Cite
|
Sign up to set email alerts
|

Design, Construction, Start-Up and Commissioning of a State-of-the-Art Water-Cooled Grate WtE-Plant for O¨rebro, Sweden

Abstract: In 2001, SEGHERS was awarded the contract for the design and construction of the furnace and heat recovery system of a new, 330 tons per day WtE-plant in Orebro¨, Sweden. A wide variety of municipal and industrial wastes (including electronic waste, demolition waste, car fluff, filters, plastic and rubber...) will be treated. The design point corresponds to an average heating value (HHV) of 13.1 MJ/kg (5600 Btu/Lb). The first part of the paper addresses the engineering and construction phase of the project, wh… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2018
2018
2018
2018

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 0 publications
0
0
0
Order By: Relevance