2015
DOI: 10.2172/1215031
|View full text |Cite
|
Sign up to set email alerts
|

Design, Operation, and Controlled-Island Operation of the U.S. Department of Energy Solar Decathlon 2013 Microgrid

Abstract: NREL prints on paper that contains recycled content.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2018
2018

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 6 publications
0
1
0
Order By: Relevance
“…Usually, the larger the energy storage capacity, the higher the price, so it is important to determine the installation capacity of the new renewable energy generation system and ESSs considering local climate and load conditions in the installation area [4]. The imbalance between energy production and demand caused by a faulty design of energy systems, such as a microgrid, makes it difficult to install optimized system capacity, thus increasing the energy production costs [5,6].…”
Section: Introductionmentioning
confidence: 99%
“…Usually, the larger the energy storage capacity, the higher the price, so it is important to determine the installation capacity of the new renewable energy generation system and ESSs considering local climate and load conditions in the installation area [4]. The imbalance between energy production and demand caused by a faulty design of energy systems, such as a microgrid, makes it difficult to install optimized system capacity, thus increasing the energy production costs [5,6].…”
Section: Introductionmentioning
confidence: 99%