Detecting the most appropriate delay analysis methods for mega airport projects

Abstract: PurposeThis study aims to detect the most appropriate delay analysis method in mega airport projects.Design/methodology/approachFirst, the criteria affecting the selection of delay analysis methods were detected through an in-depth literature review and an expert panel, which was conducted with 12 experts who have experience in delay analysis domain in mega airport projects. Later, fuzzy VIKOR (VIsekriterijumska optimizacija i KOmpromisno Resenje) approach was conducted by considering the detected selection cr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 25 publications
0
4
0
Order By: Relevance
“…By applying the SAW approach, seven key factors in the level 2 and 23 attributes in level 3 of developed DMM were analyzed in terms of significant index and important index, respectively, and the validation of DMM is applied via a series of case studies and a professional panel. Furthermore, the study by Cevikbas et al [13] was conducted through an intensive literature review and a 12-expert panel to detect the further factors impacting the selection of DAM, a total of 26 criteria were grouped into six categories and analyzed via the Fuzzy VIKOZ method for the selection of the appropriate delay analysis approach for mega airport projects. Notwithstanding, since projects are one-of-a-kind by nature, the DAM alone shall not be the best for all project circumstances under certain conditions.…”
Section: A Delay Criteriamentioning
confidence: 99%
See 3 more Smart Citations
“…By applying the SAW approach, seven key factors in the level 2 and 23 attributes in level 3 of developed DMM were analyzed in terms of significant index and important index, respectively, and the validation of DMM is applied via a series of case studies and a professional panel. Furthermore, the study by Cevikbas et al [13] was conducted through an intensive literature review and a 12-expert panel to detect the further factors impacting the selection of DAM, a total of 26 criteria were grouped into six categories and analyzed via the Fuzzy VIKOZ method for the selection of the appropriate delay analysis approach for mega airport projects. Notwithstanding, since projects are one-of-a-kind by nature, the DAM alone shall not be the best for all project circumstances under certain conditions.…”
Section: A Delay Criteriamentioning
confidence: 99%
“…The project planners and schedulers' capabilities normally are performing scheduling and control management well versed, and they are also aware of truly explaining the delays as the impacts of delays on the critical path and non-critical path of the project as well. Usually, in the previous studies [12,13], the authors adopted many professionals whose jobs were in project planning, controlling, technical office, commercial, and contract managers and those are highly unsuitable identification.…”
Section: An Integrated Ahp-rii Approachmentioning
confidence: 99%
See 2 more Smart Citations