2018
DOI: 10.1115/1.4039743
|View full text |Cite
|
Sign up to set email alerts
|

Determination and Implication of Ultimate Water Cut in Well-Spacing Design for Developed Reservoirs With Water Coning

Abstract: Theoretically, ultimate water-cut (WCult) defines stabilized well's oil and water production rates for uncontained oil pay underlain with water. However, in a real multiwell reservoir, the well's drainage area is contained by a no-flow boundary (NFB) that would control water coning, so the WCult concept should be qualified and related to the well-spacing size. Also, the presently used WCult formula derives from several simplifying assumptions, so its validity needs to be verified. The study shows that in multi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 8 publications
references
References 19 publications
0
0
0
Order By: Relevance