2014
DOI: 10.1016/j.protcy.2014.10.121
|View full text |Cite
|
Sign up to set email alerts
|

Developing a Model of Equipment Maintenance and Repair Process at Service Repair Company Using Agent-based Approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2015
2015
2018
2018

Publication Types

Select...
4
2
1

Relationship

0
7

Authors

Journals

citations
Cited by 11 publications
(4 citation statements)
references
References 1 publication
0
4
0
Order By: Relevance
“…where elements, considering TFNs, are obtained as follows (Eqs. 8 and 9): In (8) and 9, ' I is the subset of criteria to be maximized, ' ' I is the subset of criteria to be minimized, whereas * j c and  j a are computed as follows (Eqs. 10 and 11):…”
Section: Numerical Values Verbal Pairwise Comparisonsmentioning
confidence: 99%
See 1 more Smart Citation
“…where elements, considering TFNs, are obtained as follows (Eqs. 8 and 9): In (8) and 9, ' I is the subset of criteria to be maximized, ' ' I is the subset of criteria to be minimized, whereas * j c and  j a are computed as follows (Eqs. 10 and 11):…”
Section: Numerical Values Verbal Pairwise Comparisonsmentioning
confidence: 99%
“…Obviously, maintenance activities must be integrated and scheduled within the life cycle of the system under investigation and need to take into consideration the reliability features required by the system itself. Panteleev et al [8] emphasize the role of the maintenance and repair organization (MRO) and highlight the importance of implementing and planning periodic maintenance actions on machines to positively impact their life cycle. The importance of maintenance scheduling is also emphasized by Certa et al [9] who deal with the problem of selecting the elements of a repairable and stochastically deteriorating multi-component system to be replaced during each scheduled and periodic system stop within a finite optimization cycle.…”
Section: Introduction and Literature Reviewmentioning
confidence: 99%
“…Feng et al (2014) described a multi-agent based fleet maintenance personnel configuration method in order to solve the mission oriented aircraft fleet maintenance personnel configuration problem, and the proposed method could deduce optimal maintenance strategies. Panteleev et al (2014) developed a model of equipment maintenance and repair process of a service repair company based on agent-based approach, increasing the efficiency of using the available maintenance funds, and reducing the load on specialists. Most published papers in terms of maintenance modeling based on the agent-based modeling technique are developed for optimization of maintenance/repair processes, while not considering the problem of modeling maintenance decisions, component failure processes, and system availability.…”
Section: Introductionmentioning
confidence: 99%
“…Maintenance activities must be integrated and scheduled within the life cycle of the system under investigation, and take into consideration the reliability features required by the system itself. Panteleev et al (2014) The simultaneous minimization of both the total expected maintenance cost and system unavailability is ensured by means of a mathematical programming-based approach. In (Certa et al, 2012), the authors formulate a constrained mathematical model to determine both the optimal number of periodic inspections within a finite time frame and the system elements to be replaced during each scheduled inspection.…”
Section: Organisation Of Maintenance Actionsmentioning
confidence: 99%