2014
DOI: 10.1061/(asce)co.1943-7862.0000836
|View full text |Cite
|
Sign up to set email alerts
|

Developing Competitive Advantages in Political Risk Management for International Construction Enterprises

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

2
61
0
8

Year Published

2015
2015
2019
2019

Publication Types

Select...
3
3

Relationship

1
5

Authors

Journals

citations
Cited by 88 publications
(71 citation statements)
references
References 48 publications
2
61
0
8
Order By: Relevance
“…Several issues and tests have been widely considered and used in previous studies to determine whether each group of data is suitable for performing factor analysis [39,40]. In this study, the procedure recommended by Deng et al was followed [40]. The ratio of the sample size to the number of variables is 6, which was higher than the ideal ratio of 5:1.…”
Section: Data Analysis Methodsmentioning
confidence: 86%
See 4 more Smart Citations
“…Several issues and tests have been widely considered and used in previous studies to determine whether each group of data is suitable for performing factor analysis [39,40]. In this study, the procedure recommended by Deng et al was followed [40]. The ratio of the sample size to the number of variables is 6, which was higher than the ideal ratio of 5:1.…”
Section: Data Analysis Methodsmentioning
confidence: 86%
“…As shown in Table 4, all 23 variables had significant importance, meaning that the p-values were below 0.05 and the mean scores were above 3.00. Several issues and tests have been widely considered and used in previous studies to determine whether each group of data is suitable for performing factor analysis [39,40]. In this study, the procedure recommended by Deng et al was followed [40].…”
Section: Data Analysis Methodsmentioning
confidence: 99%
See 3 more Smart Citations